Lelystad Airport’s new airfield infrastructure

Project at a glance

Lelystad Airport’s new airfield infrastructure
Part of the Lelystad Airport’s developed program, a new runway, multiple taxiways and an apron area are required. With a capacity of 45,000 air transport movements per year, this will be one of the busiest runways in the Netherlands. In addition to the new runway, 16 aircrafts stands and parallel taxiway-system will be realized.

Our consultants are involved since the first days of the project. Our work includes project management, requirements engineering, technical/design management, capacity studies, masterplanning, preliminary design contract and tender preparation.

CLIENT:Lelystad Airport
TIMELINE: 2013 – 2018
CATEGORY:Airport Planning
LEAD CONSULTANT:Gé Smit